Why Hub Models Roadmap Request Info →
Modulr Hub // Where communities function

Modular community amenity buildings.

Essential amenities and infrastructure for RV parks, mobile home parks, and outdoor hospitality communities. Built off-site, delivered ready for installation. For compact single-purpose drop-in units, see our park amenity pods. Explore the Modulr homepage or the Modulr Office backyard workspace.

Hub Market concept: modular general store, market, and coffee station sited in an RV park Hub Market · Concept
8–14 weeks
Manufactured & delivered
9–18 mo saved
vs. traditional construction
3 models
Bath · Laundry · Market
The Problem

Upgrading your park shouldn't be this hard.

  • 01 Long construction timelines
  • 02 Rising labor costs
  • 03 Contractor delays
  • 04 Operational disruption
  • 05 Unpredictable project budgets
  • 06 Extensive permitting
  • 07 Lost revenue during builds
  • 08 Difficult execution

Many operators know they need better amenities to attract and retain residents and guests, but traditional site-built construction makes those improvements expensive, time-consuming, and difficult to execute.

Introducing Modulr Hub

Modular infrastructure built for parks.

Our structures are manufactured off-site and delivered ready for installation, dramatically reducing construction timelines and simplifying project execution.

Rather than managing a lengthy construction project, operators can deploy essential infrastructure faster and with far less disruption to residents.

Why Modulr Hub

A faster, more predictable way to build community infrastructure.

01 / Speed

Faster deployment

Manufactured and delivered in 8 to 14 weeks, not the many months traditional projects demand.

02 / Cost

Lower project costs

Reduce labor, contractor coordination, and unexpected construction overruns, for more predictable budgets.

03 / Quiet

Minimal site disruption

Because construction happens off-site, residents experience less noise, fewer delays, and steadier operations.

04 / Permitting

Simplified permitting

Designed as community amenities rather than dwelling units, often fewer hurdles. Requirements vary by jurisdiction.

05 / Purpose-built

Designed for parks

Built for RV parks, mobile home parks, campgrounds, workforce housing, and outdoor hospitality resorts.

The result

Modern amenities, without a major construction project.

See the models →
Infrastructure for Modern Communities

3 foundational amenities:

01

Hub Bath

Restrooms & Showers

Clean, durable, and attractive restroom and shower facilities designed to elevate the resident and guest experience.

Hub Bath floor plan: four private bathrooms with showers, 40 ft by 7 ft 4 in, 293.3 square feet
Concept floor plan · Hub Bath 40'-0" × 7'-4" · 293.3 ft²

Features may include

  • + Private shower rooms
  • + ADA-accessible layouts
  • + Commercial-grade finishes
  • + Utility-efficient fixtures
  • + Multiple size configurations
  • + Hex-tile, durable surfaces

Concept specs

Private bathrooms4
Each unit10'-0" × 7'-4"
Total length40'-0"
Total area293.3 ft²
02

Hub Laundry

On-Site Laundry

The convenience residents expect, and an additional revenue opportunity for your property.

Hub Laundry floor plan: five washers, five dryers, two folding tables, 30 ft by 7 ft 4 in, 220 square feet
Concept floor plan · Hub Laundry 30'-0" × 7'-4" · 220.0 ft²

Features & benefits

  • + Commercial washer/dryer packages
  • + Folding stations
  • + Seating areas
  • + Utility storage
  • + Vending integration
  • + Additional income streams

Concept specs

Washers (top load)5 × 27"
Dryers (front load)5 × 27"
Folding tables2 × 6'-0"
Total area220.0 ft²
03

Hub Market

General Store & Services

A central destination for residents and guests: a general store, grab-and-go market, and coffee station in one.

Hub Market floor plan: five vending machines, coffee machine, four tables and eight seats, 30 ft by 7 ft 4 in, 220 square feet
Concept floor plan · Hub Market 30'-0" × 7'-4" · 220.0 ft²

Configurations may include

  • + General store
  • + Grab-and-go market
  • + AI-powered vending
  • + Coffee station
  • + Leasing office integration
  • + Indoor seating

Concept specs

Vending machines5 × 51" W
Coffee machineLatte + drip
Seating4 tables · 8 seats
Total area220.0 ft²
The Future of Modulr Hub

One platform. Multiple solutions.

As communities evolve, so will Modulr Hub. Infrastructure designed to grow with your community.

→ Coming
Leasing Offices
→ Planned
Clubhouses
→ Planned
Fitness Centers
→ Planned
Community Rooms
→ Planned
Mail Centers
→ Planned
Package Rooms
→ Planned
Maintenance Buildings
→ Planned
Resident Service Centers

Ready to Improve Your Park?

Faster timelines
Less disruption
Better experience
Predictable costs

Request Info

Tell us about your park and we'll be in touch to discuss your project goals and infrastructure needs.

Lead time8–14 weeks
Built forRV · MH · Camp
Models readyBath · Laundry · Market
DeliveryReady for install